Contact

B3 Waste Permit Registration In Indonesia

Overview

Business Hub Asia offers comprehensive services for applying and procuring B3 Waste Permits. Our solution ensures your organization’s hazardous and toxic waste management adheres to all applicable legal and regulatory requirements, encompassing consultation and facilitating official permit issuance from relevant authorities.

Get Expert Help

Key Features

Regulatory and Technical Consultation

Our team will help you understand the types of waste, treatment methods, and regulations that apply to your business sector.

Preparation of Required Documents

Including technical, administrative, and Pertek documents from the Ministry of Environment and Forestry (KLHK).

Submission and Coordination with Related Agencies

Manage the submission process to OSS and coordinate with the Environmental Agency and KLHK.

Field Verification Assistance (If Required)

Assistance during the site visit or clarification from the government.

Official Waste Permit

Clients will obtain a legally valid Hazardous Waste Treatment Permit that can be used for operational activities.

Minimum Requirements

Company Legal Documents

Complete company legality (NIB, Deed, NPWP, etc.)

Environmental Documents

UKL-UPL or AMDAL documents

Technical Approval

Pertek (Technical Approval) of waste management from KLHK

Facility Layout

Site plan of waste management facility

Waste Identification

Identification of the type and amount of B3 waste

Common Sectors that need Environmental Permits

Manufacturing and heavy industry

Healthcare facilities and hospitals

Automotive companies and repair shops

Mining and energy

Logistics and warehousing

Laboratories and research institutes

Process and Timeline

1

Initial Consultation & Document Preparation

Discussion of B3 waste management needs and collection of documents such as company profile, environmental permit (UKL-UPL or AMDAL), and other technical documents. Estimated Time: 3-5 working days or more, upon complete document declaration.

2

Preparation of Technical Details (Rintek)

Preparation of technical documents that include facility design, treatment methods, capacity, and environmental impact analysis. Estimated Time: 10-15 working days

3

Submission of Technical Approval Application (Pertek)

Submission of Rintek documents to KLHK through the OSS (Online Single Submission) system to obtain Technical Approval. Estimated Time: 30 working days

4

Document Evaluation and Verification by KLHK

KLHK checks the conformity of documents with technical requirements. If there are deficiencies, the applicant will be asked to make improvements. Estimated Time: 4 working days per evaluation cycle

5

Issuance of Technical Approval (Pertek)

Once the documents are declared complete and compliant, KLHK issues Technical Approval as the basis for applying for an operational license. Estimated Time: 7-10 working days

6

Submission of Operational Permit for Hazardous Waste Management

Submission of the operational permit to the relevant agencies based on the Technical Approval that has been obtained. Estimated Time: 14-30 working days

7

Issuance of Operational Permit

After evaluation and verification, the relevant agency issues an operational permit for hazardous waste treatment. Estimated Time: 7-14 working days

*Assuming all processes run smoothly and without obstacles, the total estimated time needed to complete the hazardous waste license process is approximately 3-6 months.

Important Consideration

  • The process can be faster if Pertek KLHK is available.
  • Processing of B3 Waste without a permit may be subject to administrative or criminal sanctions.
  • Permits must be renewed periodically according to the validity period.
  • The application system is integrated with OSS-RBA

Frequently Asked Questions

What is a B3 Waste Disposal Permit?

A B3 (Hazardous and Toxic Substances) Waste Permit constitutes formal authorization, issued by either the central government’s Minister of Environment and Forestry or a local government authority (Governor, Regent/Mayor), for entities engaged in the collection, utilization, processing, or landfilling of hazardous waste. This permit serves as official confirmation that the respective business entity has satisfied all requisite technical and administrative stipulations for the responsible management of hazardous waste, in strict adherence to all applicable regulations.

Who is required to have a waste license?

All business entities that generate or manage hazardous and toxic waste of a certain type and volume

Do I need to have an AMDAL first?

Not always, depending on the scale of the business. However, environmental documents such as UKL-UPL or AMDAL are still required.

What is Pertek KLHK?

Pertek is a Technical Approval from KLHK, which is one of the main requirements in the licensing process.

Is this permit valid nationwide?

Yes, this license is valid throughout Indonesia, but it may be limited by the location of the business activity.

Does this service cover the management of all types of hazardous waste?

Business Hub Asia can handle various types of hazardous waste, including solid, liquid, and gas, according to your business classification and needs. Please consult with us beforehand to confirm your needs.

Secure the Right Licenses for Your Operations

Ensure compliance with Indonesian regulations by obtaining the necessary business permits and sector-specific licenses.

Service Form